AJA International ATC 1500-V & Orion Sputtering Systems

 

Preventive Maintenance Checks (weekly, monthly & biannually)

 

Weekly

01  Check Thermo-NESLAB chiller:

a.     Check water level (fill if necessary w/distilled water)

b.     Temperature should be @ 18C

c.      Pressure should be @ 62psi +/- 1.5

02  Check/record base pressure-Ion Gauge #1 (IG1)

03  Check/record (I) draw of LL & MC turbo pumps

04  Check shutter operation on all four magnetrons

 

Monthly (and gun short events)

01  Perform weekly checks

02  Clean out the chamber (record in log sheet)

a.     Vent the chamber according to procedure

b.     Open all shutters and [using a clean vacuum hose] vacuum the entire chamber, including the magnetrons whose chimneys have collected loose sputtered metal deposits

c.      If any magnetron requires further cleaning, remove the shutter, chimney & space shield: if a replacement kit (chimney & space shield) is not available, use nylon scour pads (scotch-brite) and IPA to carefully remove loose sputtered metal flakes that have collected on these assemblies.  You may need to repeat this process several times before clean-drying each assembly with N2

d.     Before re-installing all parts, do another vacuum clean of the chamber w/the vacuum hose while simultaneously spraying N2 to stir up all loose particles in the chamber.  Remove the vacuum hose and only spray N2, concentrating on the target mounting blocks (underside of copper cooling well); to prevent magnetron shorting

e.      Finally, reinstall all parts and wipe down the chamber walls with IPA (chamber can then close & pump down)

 

Biannually

01  Perform weekly check

02  Perform monthly checks

03  Inspect for crud/rust buildup in water lines: if necessary, drain chiller & plumbing, then refill with new distilled water (you will need to power down the system prior to shutting off/draining the chiller - follow the power down procedure)

04  Inspect both roughing pumps: check oil condition and level: (fill if low or replace entirely if oil is a thickening black)

05  Inspect bellows: main chamber & load lock (behind machine)

06  Inspect LL & MC turbo pumps; refill lubricant reservoir according to schedule or if necessary

 

End of procedure                                                                                              Arnold Duenes